The modular design team is responsible for two major deliverables: shop drawings and a Bill of Materials (BOM). The BOM is the fluid that lubricates the rest of the modular machinery, from submittals, schedules, procurement, manufacturing, and delivery. 

STACK U_C101_

In modular construction, design is about more than producing drawings. The information behind those drawings also needs to support everything that follows.

Alongside shop drawings, the modular design team develops the Bill of Materials (BOM), which helps connect design to submittals, scheduling, procurement, manufacturing and delivery.

In this Stack U 101, we look at why both drawings and data matter, and how they work together to keep the modular process moving from design through delivery.